You are here: RailwayPeople.com » Rail Jobs » OLE Construction Manager
| Reference | PEMCBV0805 |
| Company | Project-emc Ltd |
| Location | West London, England/London All |
| Career Level | Not Specified |
| Job Type | Not Specified |
| Position Type | Not Specified |
| Salary | £48,000 per year |
| Vacancies | 1 |
| Company Size | Medium (100-999 employees) |
| Posted Date | July 4th 2012 |
| Start Date | Not Specified |
| Closing Date | July 12th 2012 (for applications) |
Our client is working on a Crossrail contract in West London.. They require an OLE Construction Manager to join the team on site.
You are responsible for ensuring that:
•Take reasonable care for the health and safety of yourself and of others who may be affected by your actions or omissions whilst at work.
•Cooperate in all matters pertaining to Health and Safety to enable the Company to carry out its legal duties and requirements.
•Responsible for the health, safety and welfare of all persons under your control.
•Do not recklessly interfere with or misuse anything provided in the interests of health, safety and welfare.
•Bring to the attention of your manager any perceived shortcomings in health and safety arrangements or situations that you consider to be serious or imminent danger to yourself or others.
•Do not undertake any safety critical work activity or activity for which a specific competence is required, unless you have received the necessary training/instruction and/or assessment and hold the appropriate Certificate of Competence/Authority to Work. Do not instruct others to undertake such work if they do not hold the appropriate Certificate of Competence/Authority to Work.
•Responsible for advising the Project Manager and Project Team on the construction of overhead line works.
•Responsible for ensuring that Overhead Line Equipment is installed to the approved design and is compliant with Client and Industry Standards.
•Liaise with the projects team personnel to ensure their requirements are understood and complied with.
•Manage the construction budget on projects and ensure there is a robust change control mechanism to capture variations.
•Participate as required in project construction/planning meetings to ensure due consideration of processes and methods of implementation for all overhead line projects is undertaken.
•Undertake Site monitoring in accordance with the laid down programme and other ad-hoc checks on both procedure and process. Ensure suitable reports of all checks undertaken are produced and circulated to General Manager SPC, Head of Engineering SPC and other Group senior personnel as appropriate.
•Provide effective communication of information to facilitate compliance with Statutory, Industry, Mandatory requirements for use by the projects team.
•Undertake all work in accordance with all relevant client Standards and Instructions.
•Undertake Category 3 audits and management checks as directed and provide reports to appropriate Senior Management.
•Undertake Risk Assessments as required throughout the project lifecycle.
•Provide input as required to SSOW Planners to enable safe systems of work to be established for all works
•Establish and maintain project files including records of: work planned; work achieved; in process checks undertaken; change control; inspection and test documentation; compilation of H & S file; provision of as built information and handover/handback documentation.
•Undertake management of sub contractors as directed to ensure compliance with Statutory, Industry, Mandatory requirements.
•Undertake or participate in enquires and investigations as directed by Senior Management in accordance with Group Standards and Instructions.
•Provide guidance and support as necessary to site teams to ensure: methodologies and processes for work delivery are developed; work undertaken is in accordance with the design, is compliant with client requirements and meets the required quality standard.
•Undertake or participate in buildability reviews as required.
•Undertake coaching in overhead line engineering and construction techniques to the project teams as required.
•Support the project teams in the development of methodologies for electrification construction works that ensure installations are delivered cost effectively, safely and compliant with all relevant standards and codes.
•Ensure that all proposed change is managed in accordance with Group Standards, Procedures and Instructions.
The following qualifications and experience are preferable
NVQ in Supervisory Management. ONC Mechanical or Electrical Engineering. Proven experience in electrification construction. Proven experience in electrification construction. Overhead Line design. Overhead Line Construction. SCW Competencies
The client is offering a salary of circa £48,000 per annum, 25 days annual leave, defined contribution pension scheme, company cars/allowance for certain roles, BUPA healthcare.
Please contact Ben Vernon on 078244 70704 for further information.
About Us -
Contact Us -
Terms & Conditions -
Privacy Policy -
Security Policy -
Disclaimer -
Sites
Brought to you by RailStaff in partnership with CareerBuilder.
© Copyright 2012. All Rights Reserved.