Configuration & Change Manager in City of London, London, United Kingdom
A new opportunity has arisen for a C&C Manager based in Kings Cross, performing the configuration and change management activities across the signalling project portfolio. The role has a multifunctional dimension implementing and supporting the project and design engineer teams with the capture and management of contract and system configurations throughout the project life cycle.
These projects use the wide range of Alstom signalling technologies including the SMARTLOCK interlocking system, Modular Control Systems, VHLC and Electrologix systems and trackside modules including smart I/O. Our projects are multidiscipline, complex and are strategically important to our clients. Our engineering teams are supporting some of the most significant projects within the UK & Ireland.
Key responsibilities
- Write Configuration and change Management Plan (CMP) instantiating the configuration and change management process in the Project/Program (Activity 1.1)
- Establish and maintain the configuration and change management system (structure, tools). (Activity 1.2)
- Train team members to configuration and change management rules defined in the CMP and ensure CMP rules are understood and applied by every team member. (Activity 1.3)
- Ensure application of configuration and change standard procedures, instructions and templates. (Activity 1.4)
- Define Configuration and change management reporting and indicators (Activity 1.5)
- Identify and define which components will be considered as configuration items. (Activity 2.1)
- Maintain accuracy and completeness of configuration items data all along project/program life cycle. (Activity 4.2)
- Perform the role of configuration and change management tools Key User (if no Site Key User)
- Support team members to configuration and change management tools usage
- Create and publish configuration baselines (Activity 4.3)
- Write release notes, check them with Technical Manager in configuration reviews, and freeze baselines (Activity 5.1)
- Control configuration (compare As-Designed/As-Shipped/As-Installed). (Activity 5.1)
- Plan, organize and attend the CCB meetings (Activity 3.5)
- Review the Delivery Plan (If exist) (Activity 1.1)
- Suggests improvements of the activity (REX on Configuration and Change Management issues: process, organisation)
- Analyse Configuration and change management reporting and indicators and report the analyses to its department head, Core Team Manager, team members and Customer, according to rules define in the CMP
Essential Requirements
- Engineering degree or 10 years of experience in Configuration and Change Management
- Minimum 3 years of experience in Configuration and Change Management
- Minimum 10 years of experience in Configuration and Change Management if no Engineering degree
Desirable Requirements
- Knowledgeable of Signalling railway domain
- Knowledge of Lascom AEC, ClearCase, PLM Enovia, Clearquest, RTC, Git lab
- Engineering environment awareness
We are an equal opportunity employer and value diversity in our company. We do not discriminate on the basis of race, religion, colour, national origin, gender, sexual orientation, age, marital status, veteran status, or disability status.
Similar Job Searches
- Configuration Change Manager
- Configuration Change Manager in City of London
- Configuration Change Manager in London
- Configuration Change Manager in England, United Kingdom
- All jobs in City of London
- All jobs in England, United Kingdom
- Project Manager
- Project Engineer
- Site Engineer
- Site Manager
- signalling
- Design Manager
- Planning
- Engineering Manager
- Systems Engineer
- Requirements Manager
- signalling Project Engineer
- Delivery Manager
- Requirements Engineer
- signalling Design Engineer