Project Manager Highways jobs | Jobs 1 - 3 of 3
Sub Agent - Bridge Demolition
Role Sub Agent Key Responsibilities Reviewing permanent and temporary works design related to Network Rail works Producing WPP and TBS for Network Rail Works for bridge demolition Raising Temporary Works design briefs Setting up work sites with General Foreman/
Senior Quantity Surveyor
Senior Quantity Surveyor (Permanent Role) – Birmingham or London or Manchester (Flexible on Location) Hybrid Working| Major Infrastructure Projects Supporting one of the UK’s most respected construction consultancies, as they continue to grow their Infrastructure
Site Engineer
Role Site Engineer Reporting to Section Engineer / Senior Engineer Key Responsibilities Initially working with Section teams planning and producing sketches and methodologies for relavent plans and procedures for mobilising. Setting up work sites with General Foreman/